WE CREATE SOLUTIONS

Optimized Solutions for Your tasks 

TAC

2008~2009
  • NO.1 OPTICAL FILM PLANT, HYOSUNG ULSAN COMPLEX, SOUTH KOREA (EPC PROJECT)
  • ONE(1) X 200 M3 TAC STORAGE SILO SYSTEM
  • TWO(2) X 2 M3 TON BAG UNLOADING SYSTEM
  • THREE(3) X 5 T/H DENSE PHASE PNEUMATIC CONVEYING SYSTEM
  • TWO(2) X 20 M3 HOPPER WEIGHING SYSTEM
  • TWO(2) X 1 M3 HOPPER WEIGHING SYSTEM
  • ELECTRIC & CONTROL SYSTEM
2010
  • OPTICAL FILM PLANT, SKC, SOUTH KOREA (E PROJECT)
  • RAW MATERIAL HANDLING SYSTEM DETAIL ENGINEERING
2013~2014
  • NO.2 OPTICAL FILM PLANT, HYOSUNG OKSAN COMPLEX, SOUTH KOREA (EPC PROJECT)
  • FOUR(4) X 200 M3 TAC STORAGE SILO SYSTEM
  • TWO(2) X 2 M3 TON BAG UNLOADING SYSTEM
  • THREE(3) X 5 T/H DENSE PHASE PNEUMATIC CONVEYING SYSTEM
  • TWO(2) X 20 M3 HOPPER WEIGHING SYSTEM
  • TWO(2) X 1 M3 HOPPER WEIGHING SYSTEM
  • ELECTRIC & CONTROL SYSTEM